Menu

Home

High Performance ADA Domes

TekWay® ADA Domes  -  Installation Instruction Training

Background

StrongGo Industries® has designed and manufactured TekWay® High Performance ADA Domes since 2004.

Detectable warning tiles are an important orientation-device that literally every visually impaired citizen relies on to be installed in the correct location and be ADA compliant in shape and dimensions, plus maintaining a strong slip resistance and color contrast with its environment over time.  Typical locations requiring detectable warning applications are within the ‘public-right-of-way’ including sidewalk ramps, street medians, mass transit platforms, etc. Over 90% of all these ADA Dome-installations are done by concrete-contractors using the proven 'Wet-set' method into fresh concrete for practical, economical and professional reasons.

StrongGo® Industries has 3 levels or versions of installation-instructions available to meet the installing contractor's needs:

  • Written Instructions for 'Wet-set' installation into fresh concrete and/or written instructions for 'Thin-set' installs into a cured recessed area
  • Video for 'Wet-set' installation into fresh concrete and/or Video for 'Thin-set' installs into a cured recessed area
  • On-site Training through a TekWay Field Technician for both methods of installation (on request only)
     

1.      Written Instructions for 'Wet-set' installation into fresh concrete  –  automatically attached to every shipment

These instructions are written to provide each customer with an easy and complete ‘step by step’ procedure with which to follow for a successful installation.

 

 Wet-set installation-instruction into fresh concrete 
 

 

2.     Video Instructions

These video instructions allow the installer to listen to the narrator’s voice as well as being able to read the on-screen instructions. Do not use only the video for installation, but refer to the Wet-set Installation instructions above. 

 

 

3.     On-site Training    -   for Mass Transit Platforms and other larger sized projects (on request only)

Providing you the right information for your installation application is important to us.  We will work with your company or government agency to schedule a training class at a time that is beneficial for you.

In general, we suggest meeting with your Team at the jobsite to make the training ‘hands-on’ and most importantly, productive.  Our trainer will go step-by-step through a concise and project-specific Training Agenda to ensure you produce a solid maintenance-free installation of TekWay® ADA Domes.

 

Please contact our customer service department under csd@stronggo.com for further information.